



114 fotos
Localizado
San Jose, CA
San Jose, CA
Uso
1692 horas
1692 horas
Número de serie
KMTPC258KJA035552
KMTPC258KJA035552
Loading...
Este lote está protegido por la garantía IronClad Assurance.
Compra con la tranquilidad de saber que este lote ha sido inspeccionado con todo detalle por un inspector cualificado.
Número de IVA
#15460039
En depósito
No
Funciones
Air Conditioner, Rear View Camera, 2018 US EPA Label, Parallel Offset Boom, 5 ft 8 in Stick, Auxiliary Hydraulic Plumbing, Backfill Blade, 17.75 in Triple Grouser Track Shoes w/Rubber Inserts, Manual Quick Coupler, 30 in Cleanup Bucket, Additional 12 in Bucket, 18 in Bucket, 30 in Bucket, Hydraulic Thumb, Peck Grapple















Imagen: esquina delantera izquierda
Imagen: esquina trasera izquierda
Imagen: esquina trasera derecha
Imagen: esquina delantera derecha
N.º de serie/VIN
KMTPC258KJA035552
Horímetro / Odómetro
1692 hrs-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Pintura
Condición de la chapa metálica (fibra de vidrio)
Escalones/escaleras
Pasamanos
Vidrio de Cabina
Funcionamiento de las luces exteriores
Operational


Alarma de viaje
Operational
Bocina
Operational
Cinturones de seguridad
Operational
Palanca de la cerradura de control
Operational
Swing Brake
Operational
Current Safety Manual
Current Operator/Maintenance Manual



















Asiento/apoyabrazos
Espejos
Steering Controls
Controles hidráulicos
Auxiliary Hydraulic Control
Controles de los mecanismos de potencia
Dash Console
Engine Oil Pressure
The fault indicator shuts off after the engine oil pressure rises.
Luces de advertencia del motor
Operational
Calibradores
Operational
Air Conditioner
Operational
Heater
Operational
Revisión del funcionamiento limitado (cs)
The main components are in place and operational as noted.











Engine
2018 US EPA Label
Emission Label
A/C Compressor
Operational
Blow-by (subjective visual observation)
Minor
Motor de arranque
Operational
Sistema de Escape
Radiador
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
Limited Function Check
The engine started and ran. Some areas could not be visually inspected.




Left Drive Motor
Right Drive Motor
Left Final Drive
Right Final Drive
Revisión del funcionamiento limitado
The drivetrain was operational.


















Bombas (hidráulicas)
Válvulas
Tanque hidráulico
Mangueras (hidráulicas)
Auxiliary Hydraulic Plumbing
Operational
Motor para movimiento oscilante
Centro Giratorio Hidráulico
Cilindro(s) de Elevación del Brazo de la Grúa
Stick Cylinder
Cilindros del Cucharon
Thumb Cylinder
Cilindro de Elevación de Cuchilla
Revisión del funcionamiento limitado
The hydraulic system was operational.








Condición del pescante
Condición de la palanca
Clavijas y bujes de la base del pescante
Clavijas y bujes de la palanca del pescante
Clavijas y Bujes de la Palanca del Acoplador
Soporte giratorio
Cubiertas inferiores
Revisión del funcionamiento limitado (retroexcavadora)
The main components were operational in a limited check.


















Left Roller Frame
Left Track Tensioner
Left Track Shoes
Left Track Links
Left Carrier Rollers
Left Track Rollers
Left Idler
Left Sprocket
Right Roller Frame
Right Track Tensioner
Right Track Shoes
Right Track Links
Right Carrier Rollers
Right Track Rollers
Right Idler
Right Sprocket



















Condición del cangilón de la excavadora
Cutting Edge / Teeth / Adapters
Sistema Quick Connect (Conexión rápida)
Operational
Condición de la cuchilla
Condición del lado cortante de la cuchilla
Reversible-turned
Pulsador
Amarre
Not operationally checked
Accesorio (otro)
Not operationally checked
Oil Sample Analysis
| engine | hydraulic | |
|---|---|---|
| date of analysis | Jul 06, 2026 | Jul 06, 2026 |
| Silicon | 2.09 PPM | 5.37 PPM |
| Tin | 1.34 PPM | 0.76 PPM |
| Silver | 0 PPM | 0.04 PPM |
| Aluminum | 0 PPM | 0.26 PPM |
| Chromium | 0 PPM | 0 PPM |
| Lead | 1.71 PPM | 3.85 PPM |
| Copper | 0.79 PPM | 34.21 PPM |
| Nickel | 0.12 PPM | 0 PPM |
| Iron | 5.77 PPM | 3.86 PPM |
| Glycol | NEG | N/A |
| Water | NEG | N/A |
| Fuel | <5% | <5% |
Debe pagarse la totalidad del importe de los artículos antes del miércoles, 8 de enero de 3000. Se aplicarán tarifas por retraso después de la fecha de vencimiento.
Lleva tus equipos a donde deben estar con las soluciones completas de logística y envío puerta a puerta de Ritchie Bros. Nos encargamos de cada paso del viaje con nuestro servicio todo incluido para que tus equipos crucen fronteras, continentes y océanos de forma rápida y eficiente.
La información detallada del equipo tiene un ámbito limitado y Ritchie Bros. Auctioneers no ha inspeccionado ningún aspecto ni componente del equipo distinto de los expuestos expresamente aquí. A menos que se indique expresamente, no realizamos declaraciones ni ofrecemos garantías, expresas o implícitas, con respecto al equipo o a sus componentes, incluidas, entre otras, representaciones o garantías relativas a la funcionalidad, la conformidad o el cumplimiento de normativas de seguridad de autoridades u órganos reguladores competentes, así como tampoco sobre la aptitud para cualquier propósito particular o para fines de comercialización. Te aconsejamos que realices tu propia inspección detallada del equipo antes de la subasta.
Los equipos no se han probado con carga ni en todas las marchas disponibles. No realizamos declaraciones ni ofrecemos garantías relativas a que el equipo funcione de acuerdo con las especificaciones de los fabricantes. No se ha realizado ninguna inspección con respecto a ningún aspecto de funcionamiento distinto de los aquí incluidos. Solo se han suministrado fotos seleccionadas de los componentes individuales del tren de rodaje, y estas no pueden tomarse como indicativas de la condición del tren de rodaje en su totalidad.
Las dimensiones se ofrecen únicamente a efectos de estimación. Las dimensiones reales con carga pueden variar en función de la altura del camión/remolque y la configuración/posición de la máquina cargada. El comprador es el responsable exclusivo de medir todas las cargas antes de salir de nuestro sitio de subastas para asegurarse de que la carga está lista para su transporte seguro. El comprador debe verificar todas las medidas. No confíes en estas medidas para efectos de transporte.